55-58 Kennington Oval
- Location: Kennington, London
- Client: Duchy of Cornwall
- Date: 2025- ongoing
- Value: N/A
Mæ is supporting the Duchy of Cornwall to shape the next chapter of its 700 year connection to Kennington, south London. We are progressing designs for the development of 55 Kennington Oval, the former Archbishop Tenison’s School site overlooking the Kia Oval.
The project includes the redevelopment of the site to provide three separate blocks ranging from 6 to 8 storeys comprising large-scale purpose-built co-living accommodation and C3 residential dwellings, community space, co-living amenity and support space, and education space; disabled car parking, cycle parking, access off Kennington Oval and Ashmole Street, associated amenity, play, public realm landscaping, servicing arrangements, and all associated works
From the outset, the Duchy’s vision for this site has been: “A diverse housing offer and well-loved community spaces under the long-term care of the Duchy”.
The proposals include 35% affordable housing, comprising 68 affordable homes, of which 47 will be for social rent and 21 for London Living Rent. Alongside this, the scheme includes intermediate, market rented homes, and co-living homes, providing options for people at different stages of life.
The proposals have been shaped by the opportunities and constraints of this complex urban site. The design has been designed to achieve the following objectives:
1. Enriching the setting: Create a stronger frontage to Kennington Oval that responds to Stoddart and Shrewsbury House and celebrates views towards the cricket ground.
2. Improve connections: Create a new pedestrian route between Kennington Oval and Ashmole Street, improving links to the school, playground and surrounding neighbourhood.
3. Bring the site back into use: Make better use of a well-connected, previously developed site to provide a mix of homes to meet different housing needs, income and stages of life.
4. Deliver social good: Include a dedicated education space intended to support children with Special Educational Needs and Disabilities (SEND), and a flexible community facility, providing space for local groups, activities and events.
5. Landscape-led design: Integrate buildings and landscape, protecting high-quality mature trees where possible and creating new green spaces.
The proposals include a new public square with seating and shaded areas, the retention of high-quality mature trees, 32 new trees and planting across the site, gardens and shared growing spaces for residents, play features integrated into the landscape, and rain gardens, sustainable drainage, living roofs and habitat planting.
The project supports the Duchy of Cornwall’s ambition to become a net-zero estate by the end of 2032. The market and affordable flats are targeting Passivhaus certification, going beyond standard Building Regulations. A fabric-first approach will reduce energy demand, while embodied and operational carbon is being assessed throughout the design process.

Ground floor plan
Development Manager Stories
Structural Engineer Price & Myers
Environmental / M&E Engineer Couch Perry Wilkes
Project Management / Quantity Surveyor Rund / Cast
Landscape Architect Grant Associates
Planning Consultant HGH Consulting
Engagement Cascade Communications